说明
For more than 8 months Farmington Ave. has been torn up for traffic heading towards Colebrookdale. There are construction signs posted but there have been zero repairs done to fix this 1/2 mile stretch of road for over 6 months. Will this ever be paved? Even at 5 mph this road is damaging to a vehicle's suspension.
4 评论s
Anonymous (客人)
PIO (客人)
zakstone333 (注册用户)
PIO--the township gets notified via email of the reports posted in their watch area.
Best,
Zak
Community Manager
SeeClickFix
关闭 Anonymous (客人)