Sharraxaadda
Almost a year since I've complained by the lack of pedestrian right of way signs, I've almost been hit by oncoming cars coming from the Holland tunnel side. I was told a year ago when using this service that signs would go up as soon as in stock. This is a danger and this whole Blvd up to Hoboken needs traffic calming measures before something serious happens.
sidoo kale waydiiyey...
S. Please select the issue:
J. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
J. 2. Traffic: Street Signage Maintenance (For all requests for new sign installations, replacements, corrections, relocations, and removals. Requests are typically addressed within 1 to 2 months.)
S. Additional Information
J. Wax Jawaab ah lama Bixin
J. Wax Jawaab ah lama Bixin
9 Faalladas
RRC <small class="fwn">(La Caddeeyey Rasmi ah)</small>
Oliver - Resident (Isticmaale Diiwaangashan)
La qiray AndrewV (Isticmaale Diiwaangashan)
Oliver - Resident (Isticmaale Diiwaangashan)
Traffic – Jennifer C (La Caddeeyey Rasmi ah)
Traffic – Jennifer C (La Caddeeyey Rasmi ah)
Oliver - Resident (Isticmaale Diiwaangashan)
Oliver - Resident (Isticmaale Diiwaangashan)
Engineering - Althea (La Caddeeyey Rasmi ah)